Desarrollo del sistema de planeación jerárquica de la producción en Armadura S.A.S.
| dc.contributor.advisor | Suárez, Orlando de Antonio | |
| dc.contributor.author | Ibarra Guerrero, Andrés Mauricio | |
| dc.coverage.spatial | Bogotá | spa |
| dc.date.accessioned | 2023-07-26T14:42:23Z | |
| dc.date.available | 2023-07-26T14:42:23Z | |
| dc.date.created | 2014 | |
| dc.description.abstract | Armadura S.A.S es una empresa dedicada a la fabricación de productos de seguridad industrial, cuenta con un amplio portafolio que supera las 200 referencias, las cuales se clasifican en cuatro líneas principales: Protección para trabajo en alturas, cabeza, respiratoria y auditiva; su modelo de producción es bajo pedidos, que sumado al desconocimiento de su capacidad de planta y por ende, una planeación inadecuada de los procesos de manufactura, los ha llevado a incumplir en la mayoría de los pedidos de sus clientes, empleando en la mayoría de los casos horas laborales extraordinarias. Por esta razón se decidió el desarrollo del presente proyecto, con miras a la obtención de una solución de bajo costo que garantizara una mejora en el nivel de servicio. Durante la fase de diagnóstico, en la obtención de los tiempos de producción se observó que el desconocimiento de esta información y la falta de atención sobre el comportamiento de las ventas, eran las principales causas de la planeación desorganizada que como consecuencia daban la impresión de una capacidad de planta insuficiente. De tal manera que se realizó un análisis ABC que determinará los productos de mayor rotación y aquellos con un alto margen de utilidad para la empresa, la cual amablemente brindó la información pertinente, permitiendo así trabajar con una cantidad representativa en ventas, pero de número reducido. Acto seguido, se hizo una agrupación de productos que compartiesen características y ventas similares, para realizar los pronósticos de venta que sirvieron como entrada para el desarrollo del plan maestro de producción (PMP) y plan de requerimiento de materiales (MRP), obtenidos mediante el planteamiento de un problema de programación lineal con las variables pertinentes a la situación de Armadura S.A.S. Finalmente, mediante la fijación de unos indicadores de gestión y un análisis de escenarios, pudo evaluarse la bondad del plan de producción propuesto, en materia de costos y el nivel de cumplimiento de órdenes de la empresa. | spa |
| dc.description.abstractenglish | Armadura S.A.S. is a company dedicated to industrial safety products manufacturing, it counts with an over 200 products list, classified in four main lines: height jobs protection, head protection, auditory protection and respiratory protection; their work on a to order production model, in addition to the lack of knowledge of their installed capacity and therefore, an inaccurate manufacturing processes planning, has leaded them to a breach in most of their client’s purchase orders, most of the time they have drawn upon extra work time. Due to the previous reason it has been developed this project, setting the search of a low budget and a warranty of the improvement in the service level as the prime goal. During the diagnostically phase, while the acquisition of the manufacturing time was observed that the lack of knowledge of this information and sales behaviour as well, were the main cause of that disorganized production planning which misleads to interpret there’s a installed capacity deficiency. So an ABC analysis took place, in order to determine which were the best selling products and those with the highest profit as well; information that kindly enough was provided by Armadura S.A.S. This allowed working with a small group of products, yet the most representative in sales. Following that, those products which shared specifications and sales behaviour were grouped to do the demand forecast that was the input to the production master planning (PMP) and the material requirements planning development. These plans were obtained by a linear programming problem suited to the company’s situation. At the end, through management indicators and scenario analysis, the goodness of the proposed manufacturing plan in costs and service level matter of speaking. | spa |
| dc.description.sponsorship | Universidad Libre | spa |
| dc.description.sponsorship | Facultad de Ingeniería | spa |
| dc.description.sponsorship | Programa de Ingeniería Industrial | spa |
| dc.format | spa | |
| dc.identifier.uri | https://hdl.handle.net/10901/25917 | |
| dc.relation.references | S/B | spa |
| dc.rights.accessrights | info:eu-repo/semantics/closedAccess | spa |
| dc.rights.license | Atribución-NoComercial-SinDerivadas 2.5 Colombia | * |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/2.5/co/ | * |
| dc.subject | Planeación de producción | spa |
| dc.subject | Pronóstico | spa |
| dc.subject | PMP | spa |
| dc.subject | MRP | spa |
| dc.subject | Indicadores de gestión | spa |
| dc.subject.subjectenglish | Manufacturing planning | spa |
| dc.subject.subjectenglish | Forecast | spa |
| dc.subject.subjectenglish | PMP | spa |
| dc.subject.subjectenglish | MRP | spa |
| dc.subject.subjectenglish | Management indicators | spa |
| dc.title | Desarrollo del sistema de planeación jerárquica de la producción en Armadura S.A.S. | spa |
| dc.type.driver | info:eu-repo/semantics/bachelorThesis | spa |
| dc.type.local | Tesis de Pregrado | spa |
Archivos
Bloque original
1 - 3 de 3
Cargando...
- Nombre:
- Documento final.pdf
- Tamaño:
- 2.07 MB
- Formato:
- Adobe Portable Document Format
- Descripción:
Cargando...
- Nombre:
- Ibarra Guerrero Andres Mauricio.pdf
- Tamaño:
- 359.08 KB
- Formato:
- Adobe Portable Document Format
- Descripción:
Bloque de licencias
1 - 1 de 1
Cargando...
- Nombre:
- license.txt
- Tamaño:
- 1.71 KB
- Formato:
- Item-specific license agreed upon to submission
- Descripción:
